Membrane Poolside Structure

Washington Private Residence

Location: Carrara, Gold Coast, QLD

Brief: Our client suffered from early morning sunshine directly beaming through to the kitchen and adjacent rooms of the house, Our design team created a stylish sweeping membrane with a curved roof which would minimise the suns rays, bring temperatures down & give a look that would enhance the property.

Membrane Material: Ferrari 802 Sandy Beige

Steel Work Coating: Undercoat - Corrozinc / Top Coat - River Gum

Shade Membrane Structure

Design Time: 3 wks / Manufacture Time: 2 Wks / Installation Time: 4 Days

 

 

Copyright © 2008-2010 Horizon Sail Structures
Web Design by Beyond Web Development